Client: Florida Department of Transportation
Location: Lake County, FL
Construction : 2017 – 2020
The improvements under this contract consist of widening of SR-46 (US-441) including existing milling and resurfacing of SR-500 along with a new flyover ramp. Work items include paving, drainage, sidewalk, signals and ITS along with two new bridges (Pond Rd and Flyover). Total length of Roadway: 3,622 miles. Total length of Bridge: 0.089 miles.