Client: Port Tampa Bay
Location: Tampa, FL
Construction : 2017 – 2018
The project consisted of construction of new Berth 302 at Port Redwing. The project scope includes a 1,000’ long steel bulkhead, dredging, new access road to the dock and constructing a piling supported concrete slab for heavy lift cranes to operate upon.