Construction: 2001—2003

This contract for the City of Tallahassee, included the construction of 2.92 kilometers of a divided 4-lane urban roadway including the construction of twin 317 meter long precast concrete girder bridges across wetlands and a CSX railroad track. The project was originally bid as a segmental bridge but GLF’s design-build proposal for the alternate bridge resulted in a significant savings to the City of Tallahassee.