Bulkhead & GCC Canal Dredging Operation
Client: Port St. Joe Port Authority
Location: Port St. Joe, FL
Construction: 2008-2009
Construction of 1,042 LF steel sheet pile bulkhead wall, steel sheet pile tie-back wall, concrete bulkhead cap and rip-rap. Also includes 50,000 CT dredging for berth deepening in Gulf County Canal.