Veterans Expressway Widening,
Tampa, FL


Veterans Expressway Widening Client: FDOT/Turnpike Enterprise Location: Tampa, Florida Construction: 2013 – 2016 This project consists of widening of Veterans Expressway from four (4) lanes divided to eight (8) lanes divided, including conversion of mainline to all electric tolling system between Milepost 7.160 to Milepost 9.000 in Hillsborough County, FL. Work includes clearing & grubbing,

Read More

All Electronic Tolling at Veterans Expressway,
Tampa, FL


All Electronic Tolling at Veterans Expressway Client: FDOT/Turnpike Enterprise Location: Tampa, Florida Construction: 2013 – 2015 Project consisted of conversion of the existing conventional Sunpass/Cash Toll collection system on the Veterans Expressway to an All Electronic Toll (AET) collection system for mainline (one location) and ramps (4 locations) between north of Gunn Highway and Dale

Read More

SR-30 (US 98) over Aucilla River
Bridge Replacement Taylor County, FL


SR-30 (US 98) over Aucilla River Bridge Replacement Client: Florida Department of Transportation Location: Taylor County, FL Construction: 2011-2013 Description: The project consists of installation of a temporary detour bridge, work platform, demolition of two existing bridge structures, the construction of a 1,400 LF new bridge structure and the accompanying roadwork items in Taylor County,

Read More

I-595 Corridor Roadway Improvements
Broward County, FL


I-595 Corridor Roadway Improvements Client: Florida Department of Transportation Location: Broward County, FL Construction: 2009-2014 The project consists of the reconstruction and resurfacing of the I-595 mainline, including the addition of auxiliary lanes (and all associated improvements to adjacent cross-roads, frontage roads and ramps), and a new express lanes system in the I-595 median. The

Read More

Bulkhead & GCC Canal Dredging Operation
Port St. Joe, FL


Bulkhead & GCC Canal Dredging Operation Client: Port St. Joe Port Authority Location: Port St. Joe, FL Construction: 2008-2009 Construction of 1,042 LF steel sheet pile bulkhead wall, steel sheet pile tie-back wall, concrete bulkhead cap and rip-rap. Also includes 50,000 CT dredging for berth deepening in Gulf County Canal.

Read More

Alutrint Material Storage Material & Handling EPC Contract


Alutrint Material Storage Material & Handling EPC Contract Client: National Energy Corporation (NEC) Location: Trinidad & Tobago Construction: 2008-2010 The project consists of design and construction of a raw material handling and storage facility, purchased and constructed to unload bulk alumina and coke at the harbor with traveling unloaders, and transport the materials by conveyor

Read More

Miami Intermodal Center Bridge 10A
Miami, FL


Miami Intermodal Center Bridge 10A Client: FDOT/Turner Construction Location: Miami, Florida Construction: 2007-2011 Located next to the Miami International Airport, the Miami Intermodal Center is a massive ground transportation hub being developed by the Florida Department of Transportation. To be completed by 2011 the MIC Program consists of a Rental Car Center, the Miami Central

Read More

Bulkhead Seawall and Retaining Wall
Stock Island, Key West, FL


Bulkhead Seawall and Retaining Wall – Stock Island, Key West Client: Florida Keys Aqueduct Authority Location: Stock Island, Key West, Florida Construction: May 2008 – Oct. 2008 Construction of 1,200 LF of bulkhead seawall and 200 LF of retaining wall. GLF Construction proposed a Value Engineering Contractor Proposal (VECP) to the Florida Keys Aqueduct Authority

Read More

New River Bridge
Fort Lauderdale, FL


Fort Lauderdale New River Bridge Client: Tri-County Commuter Rail Authority Location: Fort Lauderdale, Florida Construction: 2003-2006 This project for the Tri-County Commuter Rail Authority consists of a new twin-track high level fixed bridge over the South Fork of the New River, positioned within the existing right-of-way. This project is located in Broward County, FL.

Read More