DART Northeast Corridor, Section G-2 Line
Dallas, Texas


DART Northeast Corridor, Section G-2 Line Client: Dallas Area Rapid Transit (DART) Location: Dallas, Texas Construction: 1999 — 2002 This project for the Dallas Area Rapid Transit Authority (DART) included demolition of existing structures, the construction of on-grade and elevated structures including a 4,700 LF bridge over sensitive wetlands, and a structure over a major

Read More

BNSF Bridge & Approaches
Fort Worth, Texas


Burlington Northern / Santa Fe Bridge & Approaches Client: Fort Worth Transportation Authority (The “T”) Location: Fort Worth, Texas Construction: 2000—2001 This project was built for the Fort Worth Transportation Authority (“The T”) and consisted of construction of retaining walls, light rail bridges and excavation in Tarrant County, Texas. Work included drilled shafts, excavation, concrete

Read More

Berth 212 Wharf, Port of Tampa
Tampa, Florida


Berth 212 Wharf Client: Tampa Port Authority Location: Tampa, Florida Construction: 1998—1999 This project for the Tampa Port Authority included the construction of a 100′ by 750′ pier at the Port of Tampa, Florida. The pier was founded on 460 each prestressed 20″ concrete piles that supported cast-in-place concrete caps and precast concrete deck panels.

Read More

State Road 688 Bascule Bridge
Largo, Florida


State Road 688 Bascule Bridge Client: Florida Department of Transportation, District 2 Location: Largo / Indian Rocks Beach, Florida Construction: 1997—2000 This project for the Florida Department of Transportation, District 2, included major widening of SR 688 and the construction of a new parallel bascule bridge across the Intracoastal Waterway in Largo, Florida. Also included

Read More

Victory Bridge
Sneads, Florida


Victory Bridge Client: Florida Department of Transportation, District 3 Location: Sneads, Florida Construction: 1994—1996 This project for the Florida Department of Transportation, District 3, included the construction of a new medium-level bridge across sensitive wetlands and the removal of the existing bridge across the Apalachicola River at Sneads, Florida. Items of work included drilled shafts,

Read More

Fuel Farm & Aircraft Apron
at US Coast Guard Station
Opa Locka, Florida


Fuel Farm & Aircraft Apron at US Coast Guard Station Client: United States Coast Guards Location: Opa Locka, Florida Construction: 1993 — 1997 The scope of work for this project for the United States Coast Guard included the construction of a 100,000 gallon fuel farm, a fuel distribution network, 22,000 SY of aircraft apron, a

Read More

Seabreeze Bridge
Daytona Beach, Florida


Seabreeze Bridge Client: Florida Department of Transportation, District 5 Location: Daytona Beach, Florida Construction: 1995—1998 The scope of work on this project for the Florida Department of Transportation, District 5, included the construction of two high-level segmental bridges over the Intracoastal Waterway in Daytona Beach. The two structures were each respectively 2,290 LF and 2,320

Read More

Berth 30 Crane Rail Extension
Port Everglades, Florida


Berth 30 Crane Rail Extension Client: Board of County Commissioners of Broward County, Port Everglades Authority Location: Port Everglades, Fort Lauderdale, Florida Construction: 1999—2000 This contract for the Board of County Commissioners of Broward County – Port Everglades Authority – was for the extension of the crane rails at Berth 30, to accommodate the arrival

Read More

Venetian Causeway – West Bridge Restoration
Miami, Florida


Venetian Causeway Bascule Bridge Restoration Client: Florida Department of Transportation, District 6 Location: Miami Beach, Florida Construction: 1997 — 1999 This project for the Florida Department of Transportation, District 6, consisted of the removal and replacement of a 2,000 LF structure across Biscayne Bay in Miami, Florida. Work included the removal of the existing bascule

Read More